Nordex builds 30 MW wind farm in Spain

According to reports, Nordex will assemble and install a 30 MW Barbers wind farm, which will be equipped with 12 wind turbines of model N90/2500. It is expected that the wind turbines will produce 88 GW per year.

It is understood that the Elecnor Group will cooperate with Nordex Corporation to invest in the wind farm. Its core business involves infrastructure projects, including the construction and operation of wind farms.

Barbers wind farm will be built in the province of Tarragona, Spain.

Eolia Renovables has begun preparations for the civil engineering of the wind farm. Nordex will install its first batch of wind turbines in April and will be connected to the grid in summer.

Solar Applied System

Wuxi Lerin New Energy Technology Co.,Ltd. , https://www.lerin-tech.com